by Paul Knutzen | Aug 10, 2020
Lead Civil Engineer for the construction of this $87.4 million new Kennewick school. The new two-story school will connect to the existing Lion’s Den gym and a remodeled auditorium. A paved track and field, tennis courts, parking lots and ball fields will be...
by Paul Knutzen | Aug 11, 2020
Lead Civil Engineer for the construction of a new credit union being constructed by DGR Grant Construction. Challenges to civil included frontage road improvements and sewer main extension. We successfully negotiated with the city to minimize the road and utility...
by Paul Knutzen | Aug 11, 2020
Lead civil engineer for the design of a new 4,000 square feet convenient store and gas station that sits on 1.38 acres. The construction value for this project was $1.3 million and construction was completed in March 2019.
by Paul Knutzen | Aug 11, 2020
Lead Civil Engineer for the construction of one new 4-story (with basement) residential building and two separate commercial buildings located in the City of Richland. We provided site grading, a site utility plan for domestic water, sewer, and storm water on site. ...
by Paul Knutzen | Aug 11, 2020
Lead Civil Engineer for a new 20,000 square foot multi-level dental/orthodontist building. The total cost for the construction is approximately $5.3 million. Some challenges that we faced was balancing the on-site excavation, building retaining walls, and providing...