google-site-verification=FEMVgLX4T9VzucAQmV0uwcFD-KknXmdmTFqU3T_A8Lk
(509) 222-0959

DESIGN WEST ARCHITECTS

KSD Administrative Center
Lead Civil Engineer for the complete remodel of this Kennewick School District school completed in 2014. General responsibilities included preparation of construction documents.

Site upgrades included construction of a new looping water system from a City transmission main from a higher pressure zone, among numerous changes to parking lots, new bus lane, irrigation system upgrades, and fire department access.

LET’S BREAK GROUND

We want to help you get the ball rolling on your project. Contact us today to get started!

A LITTLE ABOUT US

Knutzen Engineering was founded in 2015 by its president Paul Knutzen. Paul founded the firm in response to providing the BEST service and thoughtful designs with the end user in mind. 

OUR PROMISE

At Knutzen, we always ensure your project is handled professionally. 

CONTACT

5401 Ridgeline Drive Suite 160,
Kennewick, Washington 99338

All Rights Reserved • © Knutzen Engineering